Construction Process

May 2024

Early June 2024

Early July 2024

Mid-Late July 2024

Late July 2024

Early August 2024

Mid August 2024

Late August 2024

January 2025

CNC Cutting the Coosa board at the Brown Design Workshop

IMG_0415.HEIC
IMG_0400.HEIC

Preparing my garage to build the boat

5B217EAE-4504-4DB0-97DC-12F9ACF03A79-preview.HEIC
82EC8ADC-2FCF-41AD-83B5-5A583DA39FD1-preview.HEIC

Fitting together the frame and adding epoxy to strengthen joints and corners 

Finishing the frame and adding the deck on top

IMG_0434.HEIC

Some of the forward portions of the frame were also fiberglassed at this point

IMG_0972.HEIC
IMG_0988.HEIC
IMG_0993.HEIC

Fiberglassing the Deck

The sides of the hull were also templated and 3D printed spinnaker pole tube was test fit 

Installing the top bench and bow deck, as well as fitting the sides of the hull

IMG_0994 2.HEIC
IMG_1054.HEIC

Flipping the hull and adding epoxy fillets between the deck and frame; fiberglass tape was also used at high stress areas

Leveling and fitting the foil and centerboard trunk

IMG_1075.HEIC
IMG_1114.HEIC

Filling the hull with foam and a first pass at shaping it 

Cleaning the garage and flipping the boat for storage during the fall

IMG_1712.HEIC

Fiberglassing the bench and exposed frame as well as filling in final bow sections

74641488203__2DA4EFDF-3E61-4E27-9AD6-A0F04E173B11.HEIC
IMG_1717.HEIC

Fiberglass tape was extended on the corner of the hull and top deck and part of the front deck was also fiberglassed

IMG_1724.HEIC

Continuing to shape the bottom of the hull with fairing compound